Storage hall in composite ICF block studio – seen in this image. The floors have been acid stained with the deep gold ginger color, sealed and trimmed with a tiny white trim strip to blend with the walls.
The final detailing to wrap the project is underway. Only left is fireplace is installation, shown in photos on the next few pages. Very soon the building will be ready for moving in completely and the photos to be displayed can go onto the gallery walls.
The storage hallway which will be fitted with shelving leads to the small bath (back door on the right).