A view of the shower before renovation which shows the very intense and unattractive Mexican Talavera tiles from the 1970’s. The shower was built in such a way as to cut the bathroom down in size, due to a wall holding the shower plumbing which was located in a less than efficient space. Working with our client and friend, we redesigned the bathroom space to move the tub to the wall which held the sink and therefore eliminate the wall. The end result of the new design is a more simple, clean and open look to the entire bathroom. Everyone involved was pleased with the new results, us most of all.